Skip to main content

How to execute Brick masonry from Floor to roof?

How to execute Brick masonry from Floor to roof?


Brick masonry plays Important roll in construction. There are several articles available related to brick masonry. But no one explain about how to execute the entire brick masonry from Earth beam to roof.
Here, I have explained the entire brick wall masonry in practical way. I mean that what should do? what should not do?
In practical industry, There are some wrong methods are. They should be totally avoided.

There are 4 important steps in brick masonry. namely

  • up to basement
  • up to sill level
  • up to lintel level
  • up to roof level.

Brick masonry up to Basement:

Before construct brick masonry complete all surrounding column up to basement.
This is important work.
Column rising in basement before brick masonry
Column rising in basement before brick masonry

If you don't do the column rising work before brick masonry.The following difficulties will arrive.
During making brick wall, Shedding of mortar in to the Column bottom and gets rigid and not easily removable. 

brick masonry before column rising
brick masonry before column rising

In next day, after completing the shuttering work, some saw dust from the shuttering materials like plywood, timber also shedding in to the column bottom. They are not easily removable after shuttering.

column bottom have lot of timber waste, saw dust in brick masonry
column bottom have lot of timber waste, saw dust in brick masonry

If you place the column concrete after completing the brick masonry, the water in the concrete is sucked  by dry brick wall and there will be a dry concrete placed without sufficient water cement ratio resulting a weak structure formed.

So. The correct procedure is first complete the column work and next do the brick wall. Refer the image below you can get some advantages.

Brick masonry after column
Brick masonry after column


First, Clean the entire Earth beam with water and ready surface. Apply semi solid cement slurry on it. Sprinkle the brick with water. Chip the column sides with  chisel and get the column surface rough in order to get better bonding with brick joint.

First construct the brick masonry as a reference pillar just like a benchmark in all corners with the help of plump, set square and check each opposite brick wall corner with level for each 3 courses. Adjust the mortar thickness to ensure the level. follow the remaining until it is reached the basement.

set square and plump used in brick masonry
set square and plump used in brick masonry
Recommended method
Brick masonry at 4 corners
Brick masonry at 4 corners
 Not Recommended method
brick masonry weak joint
brick masonry weak joint
brick masonry weak joint
brick masonry weak joint
You have 2 options  just like above. Any one method should to followed at corners and in cross wall extension.

  • In the 1st method, No weak straight  joints. Mortar can be easily inserted.
  • In the 2nd method, There will be weak straight joint. Mortar can't be easily  inserted in further proceeding.


 After completing the the corner reference wall, you can build the each course one by one by connecting a strong thread between the two benchmark and can complete the entire basement.

Thread connecting two benchmark wall
Thread connecting two benchmark wall

brick masonry recommended method
brick masonry recommended method

Brick Masonry up to sill and lintel:

In plinth, before go to superstructure some important works should be completed like damp proof course, providing plinth belt, basement inner plastering, sand filling in to basement, providing flooring concrete and its related works.

After that, Column should be raised up to lintel level as earlier said.Once again follow the same method in basement like first construct the corner benchmark pillar and complete the entire sill level.

In door opening and in window opening, construct some  dummy brick with poor mix and make some marks on it. Please refer the following image.

brick masonry with dummy brick
brick masonry with dummy brick
After 24 hours, Remove the dummy brick. so you need not difficulties in fixing clamp to doors and window. So damaging the structure is avoided.

clamp fixing in door in brick masonry
clamp fixing in door in brick masonry
clamp fixing in window
clamp fixing in window
Sill Slab must be placed for a extra 9'' length on each side of window opening.
After fixing door and window rich concrete should be used to fill the clamp holes.After reaching the lintel level provide lintel, sunshade and loft concrete as required.

Brick Masonry up to sill and lintel:

There is special instruction in lintel level to roof level. Just follow the same method explained in basement level. care should taken in top most course and it;s level should be checked. because it is the most important in laying of roof slab in level.

Brick masonry reached roof level
Brick masonry reached roof level

So, Hope you understand the brick masonry construction in practical way. 

Conclusion:

Some important points must be followed
  • Always first construct column and finish the brick masonry
  • First built the benchmark wall at corners and proceed further.
  • Build dummy brick at opening.
  • Leave space for sill slab.

Related links: Brickwork Rate, Damp proofing, Window placing, Parapet wall, cover block, Toilet  installation 






Comments

  1. Nice blog, I hope architectures may be inspired by these great interior designs.Thanks for sharing this wonders with us.

    ReplyDelete
  2. Nice blog of good brickwork! So I glad to see that it shows the best measurement of brickwork also makes a strong and finishing work. There are a lot of brickwork companies available but I knew my friends Brickpoint London Ltd is the best brickwork company that can be made good finishing brick repointing.

    ReplyDelete
  3. Thank you for your articles that you have shared with us. Hopefully you can give the article a good benefit to us. Semi Light Bricks in Gauteng

    ReplyDelete
  4. I am heartily impressed by your blog and learned more from your article. Thank you so much for sharing with us. I find another blog as like it. If you want to look, visit here Brick Grill , It’s also more informative.

    ReplyDelete
  5. italian kitchen designs companies
    The latest modern Italian kitchens and all modern Italian kitchens have a modern, distinctive and elegant character that matches any kitchen. Italian gives you a sense of luxury and European quality.

    ReplyDelete
  6. Useful Information (https://pencilinteriors.co.in/)

    ReplyDelete
  7. such an interesting article. Thank you so much for this blog.
    Brooklyn brownstone renovation contractors,

    ReplyDelete
  8. I usually think of informative content as dull but necessary for learning. Interesting informational articles like this are rare. This material is informational without being boring and intimidating. Thank you. Pointing by Tony Wallace are brickwork specialists working to preserve, restore and improve buildings for over 30 years. We are specialist in the Pointing industry with wide-ranging knowledge and experience on residential, commercial and historical buildings.

    ReplyDelete
  9. Hi,
    I just fall in love with your informative articles and I want more from you. Brick houses are common in New York. This is due to the strength and durability of brick properties. However, if you ignore them, you may suffer long-term consequences. It may not be obvious at first, but as soon as you see something that needs to be corrected, brick pointing contractors in brooklyn we at Aslam and Sons advocate acting quickly to repair your property before it becomes a larger problem that spreads into the interior. As a result, you’ll end up paying extra for repairs that may have been avoided.

    ReplyDelete
  10. Your blog post on executing brick masonry from floor to roof provides a clear and methodical guide on the process. I found your tips on the importance of leveling each course and the use of mortar consistency particularly insightful—it’s amazing how small adjustments can impact the structure’s stability. I’m also interested in your advice regarding joint finishing; the emphasis on weather resistance is crucial, especially in areas prone to heavy rainfall.

    Could you share some guidance on how to handle any minor shifts or settling that may occur in the early stages of masonry? For example, are there specific preventative measures or adjustments one can make in the initial brickwork to accommodate potential movement? Thank you for the detailed guidance!

    ReplyDelete

Post a Comment

Popular posts from this blog

How to save sun shade for life long?

How to save sun shade for life long? Sun shade is a important protection element in construction. It protect doors, window and inner side of building from hot sun light and rain water. If sun shade is not effectively placed and finished, several problem will occur. Major failure will arise if it is not perfectly placed and finished.  In this Article , we are going to discuss about how to place and finish a sun shade by step by step. I have given some images how to provide concrete and finish. Make comparison with one another. so you can understand. Take a close look at the following image and find what are errors are placed?  Example of sun shade placed and finished Example of sun shade finished in lower angle Any guess friends? What is wrong with the above images? Okay Friends, Later on in this article we will discuss the problems. How to place a sunshade concrete in perfect way? First of all, How to place a sun shade concrete in perfect way?

cover block, what is cover block? where cover block should be placed?

Cover block and uses of cover block Introduction: RCC members like footing, column, Beam and Roof slab must have clear cover. Clear cover is nothing but a gap between outer edge of concrete surface and outer edge of Reinforcement. Clear cover is not constant for all RCC members. For Roof slab, it must be 20 mm For Beam, column and footing, it must be 40 mm. Clear cover must be greater if section area of particular RCC member is larger and less if section area is small. If we don’t follow clear cover, Failure at surface of the concrete may occur. So that, so many cracks   will form. Some examples of failure of roof slab those not using cover block: no cover block causing damage at early stage  no cover block causing severe damage In order to maintain a gap between outer edge of concrete surface and edge of Reinforcement, we should place a small block called cover block. Below the image of cover block for your reference. dimension o

Staircase From marking to Finishing

Staircase From marking to Finishing Staircase is an important structural part in construction. It allows user to go further floors. Staircase must be constructed in proper way. Otherwise, User can not feel comfortable in using other further floors. I mean that staircase have certain limitation. What are they? Each flight having Steps not more than 12 nos Riser should not more than 7'' and not less than 5'' Tread must be not less than 9''. Height of the handrail must be exactly 2'6''. What ever may the number of flight and length of flight, but each flight must have a landing after 12 steps width of staircase must be at least 3'0''  for residence and 4'0'' for public. Here I have given a example of finished staircase. Staircase finished The above staircase satisfies the above said limits or rules. 1st flight having 12 steps. Height of the Riser is 7'' Tread width is 11'' and 12&#